en:case_approval
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
en:case_approval [2020/05/10 15:34] – [Using Planning Module] onyxadmin | en:case_approval [2021/12/15 08:02] (current) – onyxadmin | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ~~NOTOC~~ | + | |
- | =====Case Approval===== | + | ======Case Approval====== |
---- | ---- | ||
Line 6: | Line 6: | ||
---- | ---- | ||
==== Using Planning Module ==== | ==== Using Planning Module ==== | ||
+ | If the planning is to be approved and released using the actual planning module itself (e.g. module [[aligner_3d | Aligner 3D]]), then the examiner needs at least program version OnyxCeph³™ 3D PRO with the relevant planning module. \\ | ||
+ | In such case, the // | ||
+ | The modifications / change requests saved by the examiner as a separate project on the same finding can either be accepted directly by the laboratory or partially incorporated into the original planning.\\ | ||
+ | |||
{{: | {{: | ||
---- | ---- | ||
==== Using Approval Module ==== | ==== Using Approval Module ==== | ||
+ | If the planning is to be approved and released using module [[approval_3d | Approval 3D]], then the examiner only needs the OnyxCeph³™ BASIC program version. \\ | ||
+ | In such case, the service provider sends the // | ||
+ | The modifications / changes saved by the examiner in the approval finding can be re-opened by the laboratory in the approval module or in full screen and completely or partially incorporated into the original planning. \\ | ||
+ | |||
{{: | {{: | ||
+ | |||
+ | ---- | ||
+ | |{{: |
en/case_approval.1589117685.txt.gz · Last modified: 2020/05/10 15:34 by onyxadmin